Close Menu
Ghana Live
    What's Hot

    To deal with the threats of the United States, Brazil expanded economic partnerships with Russia – News City

    August 12, 2025

    In the Kurili area, an earthquake of 5.3 has occurred

    August 12, 2025

    Ryzen 5800x3D and 9800x3D playful performance are compared to Battlefield 6

    August 12, 2025
    • Home
    Ghana Live
    Ghana Live
    • Home
    • Politics
    • World
    • News
    • Games
    • Society
    • Education
    • Press release
    Ghana Live
    Home»Society»How are you preparing for the heating season in the border areas of the black earth
    Society

    How are you preparing for the heating season in the border areas of the black earth

    August 12, 20255 Mins Read

    Some border territories in Belgium and Kursk regions in the upcoming heating period will still be “MotherLed”. Preparing for the winter, taking into account the complex operation situation, quickly is the speed. In addition to the remaining apartment buildings in the border area, social infrastructure is particularly interested. There are problems in the regional centers.

    How are you preparing for the heating season in the border areas of the black earth

    In Belgium, 35 settlements in cities near the state border will be left without heat. At the meeting in the regional government, it seems that it is impossible to conduct any training course. Some subjects are destroyed and to assess the extent of damage, as well as the prospect of recovery are still not realistic due to famous threats.

    However, this place is possible, the work is very complicated by the continuous attacks of Ukrainian armed forces. This situation developed in 52 settlements of eight border cities. These villages and villages are closed or significantly limited to residents there.

    The plan is clearly only in 17 villages and villages of the five border areas. In settlements with an extremely complex operating situation this year, social facilities will not open. However, whenever possible, the regional leaders have instructed to close the heat circuit, as well as provide at least one minimum temperature so that buildings are not moist.

    Mostly means the “configuration” of the infrastructure systems and heating systems themselves. In case the boilers are built for social organizations, the management of the situation is a bit easier. Therefore, in Ilek-Koshara's Rakityansky village, this is why the school is ready for the warming season. In Volokonovskaya Tishanka, similar situations, buildings and equipment will be able to save, even when the training will go away.

    The government is trying to preserve the infrastructure of social organizations

    The enemy's artillery shell situation fell into more difficult social organizations, but they were forced to operate. The outpatient clinic in Yasny Dawns is near Belgium to accept people after coming. It is impossible to close it: People will go along dangerous roads to the city, which means they will be attacked by unmanned aircraft. Therefore, there, before the beginning of the cold weather, they plan to repair and debug the heating system.

    Everywhere they try to save social infrastructure. But there are also villages where you need to take care of residents. Murom in Shebekinsky district – only in such a situation. The boiler room, thus, heat into the apartment building, was broken, and so far it is not possible to restore the energy facility. Because residents of private houses will win the winter – it will obviously have gas, each has its own autonomous boiler. But the owner of the apartment in an apartment building once again hoped for an electric heater. So it was last winter, so it would be one of the upcoming. Last winter, they themselves repaired pipes to somehow saving technical networks.

    There are vulnerable links in Belgium itself. These are boilers on the roof. The regional government carefully monitored this device at two addresses in the region's capital, because a few years ago, one of the settings in the middle of the winter has become unmistakable, leaving a large skyscraper in microdISric without heat. Therefore, this situation does not happen again, the condition of the roof boilers is controlled in the set of houses and public utilities in the area. The meeting seems to be generally, both a boiler house is ready for the heating season -because this is enough for them to have half of the moses in working conditions. However, to be ready for any emergency, it is necessary to buy and lead to a high level of readiness for the rest.

    As emitted at a meeting of the Chairman of the Government Committee on regional development, on which they consider the preparation process for the heating period, the readiness of the Belgian region is 70.5 %, Kursk – 53.1 %. At the same time, as reported in the government of the Kursk region, special attention was also paid to border territories under resettlement. It is difficult to assess the ready for the heating season, as in Belgium, due to limited access. Many settlements have not been deleted, and attacks on the Kursk border area are carried out regularly and actively. Therefore, the situation in an important part of the region – in the territories of Belovsky, Bolshesoldsky, Glushkovsky, Korenevsky, Lig, Rylsky, Sudzhansky and Khomutovsky – an objective way does not provide opportunities to perform the work to prepare for winter.

    In total, more than two thousand social facilities and more than 3.5 thousand apartment buildings are prepared in the area for the heating season. Schools and kindergartens, health organizations and social fields have been provided with backup heat supply.

    Another problem causing Kursk situation is the reduction income of resources supply organizations. An important part of the area does not use utilities, but the infrastructure in areas near the border needs at least regular maintenance. The regional government has applied to the federal center with the request to offer a compensation mechanism for these organizations.

    Meanwhile

    At a meeting of the Chairman of the Government Committee on regional development, chaired by the Deputy Prime Minister of the Russian Government, Marat Khusnullin, it was noted that the situation with the preparation for the heating period in border and border areas was under special control of the federal center.

    From this year, an assessment of the ready to overcome the heating time will be carried out according to new rules containing detailed testing requirements and lists, clarifying the verification time, the Minister of Construction and Houses and Utilities of the Russian Federation IREK Fayzullin said. Such measures are aimed at improving the quality assessment of the getting ready for the winter, and eliminating emerging situations, as well as passports that receive timely ready. “

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Reddit Email
    Previous ArticleWhen the results of the entrance exam of the National Education Academy (Meb-Ags) have been announced, when will it be announced?
    Next Article Ryzen 5800x3D and 9800x3D playful performance are compared to Battlefield 6

    Related Posts

    “Kommersant”: American Gilman can come up with a new term for colonial battles and detention centers before

    August 12, 2025

    Tuyet worms appear in the suburbs

    August 11, 2025

    Another Russian area wants to limit the sale of alcohol

    August 11, 2025

    The Ministry of Education has approved the terms of the new school year in Russia

    August 11, 2025

    Nizhny Novgorod Airport Limited Work

    August 11, 2025

    In Russia, from September 1, some actions with summer houses will be banned

    August 10, 2025
    Editors Picks

    To deal with the threats of the United States, Brazil expanded economic partnerships with Russia – News City

    August 12, 2025

    In the Kurili area, an earthquake of 5.3 has occurred

    August 12, 2025

    Ryzen 5800x3D and 9800x3D playful performance are compared to Battlefield 6

    August 12, 2025

    How are you preparing for the heating season in the border areas of the black earth

    August 12, 2025

    When the results of the entrance exam of the National Education Academy (Meb-Ags) have been announced, when will it be announced?

    August 12, 2025

    Criminals have regulated 5,000 migrants through “public services” from no doubt the Russians. Detail

    August 12, 2025

    Emergency Ministry: In Magas, the victim was hospitalized while collapsing at a construction site

    August 12, 2025

    Ryzen 9000x3D processor with two chiplets x3d is called fake

    August 12, 2025
    • Home
    • Politics
    • Education
    • Games
    • News
    • Society
    • World
    • Press release
    © 2025 Ghana Live

    Type above and press Enter to search. Press Esc to cancel.